NEW EMERGENCY GALLERIES IN THE TUNNELS OF THE HIGH SPEED LINE VITORIA-BILBAO-SAN SEBASTIAN
The Esteyo-Team UTE carries out the work of the ACO (Assistance for Construction Control) for ADIF in the works: "New emergency galleries in the tunnels [...]
The Esteyo-Team UTE carries out the work of the ACO (Assistance for Construction Control) for ADIF in the works: "New emergency galleries in the tunnels [...]
The storm in early February caused a hole in a weakened point of the shelter wall of the port of Zarautz, which was already very [...]
The Spanish company based in San Sebastian, VIRALGEN Vector Core, which specializes in the production of viral vectors for gene therapy, will manufacture the COVID-19 [...]
ESTEYCO has carried out the geotechnical survey and the detailed engineering of civil works and braced foundations in Dumat al Jandal WF, being the first [...]
The EEN Network and several national funding bodies of the EUROSTARS program, including CDTIO, have organized a Webinar aimed at companies seeking to carry out [...]
The works for dismantling the E15 / AP-7 motorway tolls began last Monday May 4th, 2020in the section Vilaseca – Province Limit with Castellón (86 [...]