Category: Environment
PROJECT AND WORKS MANAGEMENT REPAIR OF THE ZARAUTZ PORT DOCK (GIPUZKOA)
During the storms of February 2020, the force of the sea caused a large hole in the dock of Zarautz Port, affecting the boats that...
ENVIRONMENTAL PROCESSING OF THE TERRA ENERGÍA PROJECT
Last August, AES Gener entered the so-called Terra Energía Renovable, a hybrid and renewable generation project into the Environmental Assessment Service (SEA), which includes the...
THE REPAIR WORKS OF THE ZARAUTZ PORT, ABOUT TO CONCLUDE
The storm in early February caused a hole in a weakened point of the shelter wall of the port of Zarautz, which was already very...
ESTEYCO TO DEVELOP STRUCTURAL REPAIR PROJECT TO OUTER HARBOUR WALL IN ZARAUTZ
After the storm of February 12 on the Gipuzkoan coast, which which caused havoc at the outer harbour wall of the Port of Zarautz, Esteyco...
ESTEYCO WILL PERFORM THE CONSTRUCTION PROJECT OF SANITATION AND PURIFICATION IN EIGHT MUNICIPALITIES IN THE SURROUNDINGS OF CASTROVIDO DAM
The Dirección General del Agua (Water General Direction), has awarded Esteyco with “The technical Assistance for the performing of wastewater projects from the urban centre...