The Minister of Territory of the Generalitat de Catalunya, Juli Fernández, and the General Director of Mobility Infrastructures, David Prat, presented last March 15th the [...]
Category: Environment
09/03/2023
THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA – IRUN CONNECTION WILL BE COMPLETED IN 2024
During yesterday's visit to the Gaintxurizketa tunnel, the general manager of Adif AV, Juan Pablo Villanueva, the Minister of Transport Iñaki Arriola and the delegate [...]
The tender The design proposed by Esteyco, UNStudio and b720 under the motto “Chamartín Open Ecosystem” has obtained the maximum score in the international tender [...]