{"id":4728,"date":"2021-04-28T10:46:05","date_gmt":"2021-04-28T10:46:05","guid":{"rendered":"https:\/\/newesteyco.demosbluefish.es\/es\/?p=4728"},"modified":"2022-08-25T07:19:46","modified_gmt":"2022-08-25T07:19:46","slug":"final-phase-of-construction-of-glories-tunnels-project","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/","title":{"rendered":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT"},"content":{"rendered":"<p>As announced by Ada Colau, the Mayoress of Barcelona, during her visit to the works of the Gl\u00f2ries tunnels on April 22, the seaside tunnel gallery will be put into service next September. The mountainside gallery will enter into service in December.<\/p>\n<p>The execution works for the Gl\u00f2ries tunnels are entering their final phase. With the engineering works mostly finished, the execution works of different installations systems as well as the architecture and finish of the tunnel are currently being undertaken.<\/p>\n<p>Gl\u00f2ries tunnels are made up of two independent 957m long galleries, with 3 lanes in each direction, going under 4 existing railway tunnels. At its lowest point, the tunnel is 30m deep standing 15m below water level.<\/p>\n<p>The tunnel execution works began in 2015 and have involved a total investment of 192 million euros.<br \/>\nESTEYCO is the author of the construction project and has participated in the different phases of the works execution as Technical Assistance to Property. Furthermore, it took part of the Construction Management team.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As announced by Ada Colau, the Mayoress of Barcelona, during her visit to the works of the Gl\u00f2ries tunnels on April 22, the seaside tunnel  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":4729,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5,9,12,13,247,273,281],"tags":[],"class_list":["post-4728","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infraestructuras","category-viaria","category-estructuras","category-ingenieria-del-terreno","category-50-anos-2","category-esteyco-2","category-innovacion-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Laura March\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2021-04-28T10:46:05+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-08-25T07:19:46+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#article\",\"name\":\"FINAL PHASE OF CONSTRUCTION OF GL\\u00d2RIES TUNNELS PROJECT | Esteyco\",\"headline\":\"FINAL PHASE OF CONSTRUCTION OF GL\\u00d2RIES TUNNELS PROJECT\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/Tunel-Glorias.jpg\",\"width\":940,\"height\":630},\"datePublished\":\"2021-04-28T10:46:05+02:00\",\"dateModified\":\"2022-08-25T07:19:46+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#webpage\"},\"articleSection\":\"Infraestructuras, Viaria, Estructuras, Ingenier\\u00eda del Terreno, 50 a\\u00f1os, Esteyco, Innovaci\\u00f3n, Opcional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"position\":2,\"name\":\"Infraestructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/#listItem\",\"name\":\"Viaria\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/#listItem\",\"position\":3,\"name\":\"Viaria\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#listItem\",\"name\":\"FINAL PHASE OF CONSTRUCTION OF GL\\u00d2RIES TUNNELS PROJECT\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#listItem\",\"position\":4,\"name\":\"FINAL PHASE OF CONSTRUCTION OF GL\\u00d2RIES TUNNELS PROJECT\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/#listItem\",\"name\":\"Viaria\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/\",\"name\":\"Laura March\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Laura March\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/\",\"name\":\"FINAL PHASE OF CONSTRUCTION OF GL\\u00d2RIES TUNNELS PROJECT | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/Tunel-Glorias.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#mainImage\",\"width\":940,\"height\":630},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/final-phase-of-construction-of-glories-tunnels-project\\\/#mainImage\"},\"datePublished\":\"2021-04-28T10:46:05+02:00\",\"dateModified\":\"2022-08-25T07:19:46+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#article","name":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco","headline":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2021\/04\/Tunel-Glorias.jpg","width":940,"height":630},"datePublished":"2021-04-28T10:46:05+02:00","dateModified":"2022-08-25T07:19:46+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#webpage"},"articleSection":"Infraestructuras, Viaria, Estructuras, Ingenier\u00eda del Terreno, 50 a\u00f1os, Esteyco, Innovaci\u00f3n, Opcional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","position":2,"name":"Infraestructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/#listItem","name":"Viaria"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/#listItem","position":3,"name":"Viaria","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#listItem","name":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#listItem","position":4,"name":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/#listItem","name":"Viaria"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/","name":"Laura March","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g","width":96,"height":96,"caption":"Laura March"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/","name":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2021\/04\/Tunel-Glorias.jpg","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#mainImage","width":940,"height":630},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/#mainImage"},"datePublished":"2021-04-28T10:46:05+02:00","dateModified":"2022-08-25T07:19:46+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/","article:published_time":"2021-04-28T10:46:05+00:00","article:modified_time":"2022-08-25T07:19:46+00:00","twitter:card":"summary","twitter:title":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT | Esteyco"},"aioseo_meta_data":{"post_id":"4728","title":null,"description":"","keywords":"","keyphrases":null,"primary_term":null,"canonical_url":"","og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-05-27 10:59:01","updated":"2025-06-05 06:53:48","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/\" title=\"Infraestructuras\">Infraestructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/\" title=\"Viaria\">Viaria<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/"},{"label":"Viaria","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/"},{"label":"FINAL PHASE OF CONSTRUCTION OF GL\u00d2RIES TUNNELS PROJECT","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/final-phase-of-construction-of-glories-tunnels-project\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/4728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=4728"}],"version-history":[{"count":3,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/4728\/revisions"}],"predecessor-version":[{"id":7527,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/4728\/revisions\/7527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/4729"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=4728"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=4728"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=4728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}