{"id":4461,"date":"2020-10-16T11:10:04","date_gmt":"2020-10-16T11:10:04","guid":{"rendered":"https:\/\/newesteyco.demosbluefish.es\/?p=4461"},"modified":"2022-08-25T07:19:42","modified_gmt":"2022-08-25T07:19:42","slug":"primer-cale-obra-galerias-de-emergencia","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/","title":{"rendered":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES"},"content":{"rendered":"<p>Last Monday, September 28<sup>th<\/sup>, the first breakthrough was successfully completed in the emergency gallery of the Zar\u00e1tamo tunnel. This gallery has a length of 728.30 meters and is one of the 7 galleries that are planned to be executed in the works: &#8220;New emergency galleries in the tunnels of the Vitoria-Bilbao-San Sebastian high-speed line. Section: Vitoria-Bilbao &#8220;, where the UTE Esteyo-Team carries out the Work Control Assistance for ADIF.<\/p>\n<p>The first breakthrough was performed when the two execution fronts met, by excavating and supporting the entire section of the fronts from the outlet and junction number 1. Within a month and a half, a second breakthrough is scheduled, when the two new fronts executed from junction number 1 and junction number 2 meet.<\/p>\n<p>The works are necessary to comply with European legislation requiring a maximum distance of 1,000 meters between safe areas in railway tunnels. Since the tunnels were already finished before the approval of these regulations, it is necessary to adapt them with emergency exits.<\/p>\n<p>A total of 7 emergency galleries will be built parallel to the corresponding tunnels, with a separation between the axis of the main tunnel and the axis of the gallery of 30 meters. The lengths of these vary between 73 m and 1,410 m of the longest. The 25 m2 section allows the circulation of medical and emergency vehicles.<\/p>\n<p>The excavation method is the full section NAM (New Austrian method), establishing different types of support depending on the quality of the rock mass:<\/p>\n<p>Section type I, for soil with RMR&gt; 45. 3m pass, gunning with a thickness of 10 cm, 13 bolts type Swellex of 3 m<\/p>\n<p>Section type II, for soil with 25 &lt;RMR&gt; 45. \u00a02m pass, gunning with a thickness of 17 cm, 17 bolts type Swellex of 3m and TH-21 trusses every meter.<\/p>\n<p>SG-B type section, for soil with RMR &lt;25. 1m pass, gunning with a thickness of 20 cm, 4 bolts type Swellex of 3m and trusses type HEB-160 every meter.<\/p>\n<p>Finally, it is established a waterproofing with 2 mm thick PVC film, and a finish in the coating of 20 cm. of HM-30 concrete with a fiber content of 2.5 Kg \/ m3. The bottom slab is made of the same type of concrete with a thickness of 30 cm.<\/p>\n<p>The works have been awarded to the company Obras Subterr\u00e1neas, with a total amount of \u20ac 25,220,115 to be carried out in 27 months.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last Monday, September 28th, the first breakthrough was successfully completed in the emergency gallery of the Zar\u00e1tamo tunnel. This gallery has a length of 728.30  [&#8230;]<\/p>\n","protected":false},"author":16,"featured_media":4462,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5,12,149,247,273,274,281,310],"tags":[],"class_list":["post-4461","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infraestructuras","category-estructuras","category-idi","category-50-anos-2","category-esteyco-2","category-ferroviaria-2","category-innovacion-2","category-tuneles-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Esteyco\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2020-10-16T11:10:04+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-08-25T07:19:42+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#article\",\"name\":\"FIRST BREAKTHROUGH ZAR\\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco\",\"headline\":\"FIRST BREAKTHROUGH ZAR\\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/esteyco\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Galerias2.jpg\",\"width\":940,\"height\":630},\"datePublished\":\"2020-10-16T11:10:04+02:00\",\"dateModified\":\"2022-08-25T07:19:42+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#webpage\"},\"articleSection\":\"Infraestructuras, Estructuras, I+D+i, 50 a\\u00f1os, Esteyco, Ferroviaria, Innovaci\\u00f3n, T\\u00faneles, Opcional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"position\":2,\"name\":\"Infraestructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"name\":\"Estructuras\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"position\":3,\"name\":\"Estructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#listItem\",\"name\":\"FIRST BREAKTHROUGH ZAR\\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#listItem\",\"position\":4,\"name\":\"FIRST BREAKTHROUGH ZAR\\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"name\":\"Estructuras\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/esteyco\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/esteyco\\\/\",\"name\":\"Esteyco\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/66ef5e3d7da27aff44d68b143628d2660d01f7730b0867540b6fdfd02a14f00f?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Esteyco\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/\",\"name\":\"FIRST BREAKTHROUGH ZAR\\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/esteyco\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/esteyco\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Galerias2.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#mainImage\",\"width\":940,\"height\":630},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/primer-cale-obra-galerias-de-emergencia\\\/#mainImage\"},\"datePublished\":\"2020-10-16T11:10:04+02:00\",\"dateModified\":\"2022-08-25T07:19:42+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#article","name":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco","headline":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/esteyco\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2020\/10\/Galerias2.jpg","width":940,"height":630},"datePublished":"2020-10-16T11:10:04+02:00","dateModified":"2022-08-25T07:19:42+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#webpage"},"articleSection":"Infraestructuras, Estructuras, I+D+i, 50 a\u00f1os, Esteyco, Ferroviaria, Innovaci\u00f3n, T\u00faneles, Opcional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","position":2,"name":"Infraestructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","name":"Estructuras"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","position":3,"name":"Estructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#listItem","name":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#listItem","position":4,"name":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","name":"Estructuras"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/esteyco\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/esteyco\/","name":"Esteyco","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/66ef5e3d7da27aff44d68b143628d2660d01f7730b0867540b6fdfd02a14f00f?s=96&d=mm&r=g","width":96,"height":96,"caption":"Esteyco"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/","name":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/esteyco\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/esteyco\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2020\/10\/Galerias2.jpg","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#mainImage","width":940,"height":630},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/#mainImage"},"datePublished":"2020-10-16T11:10:04+02:00","dateModified":"2022-08-25T07:19:42+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/","article:published_time":"2020-10-16T11:10:04+00:00","article:modified_time":"2022-08-25T07:19:42+00:00","twitter:card":"summary","twitter:title":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES | Esteyco"},"aioseo_meta_data":{"post_id":"4461","title":null,"description":"","keywords":"","keyphrases":null,"primary_term":null,"canonical_url":"","og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-05-27 11:00:03","updated":"2025-06-05 06:49:20","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/\" title=\"Infraestructuras\">Infraestructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/\" title=\"Estructuras\">Estructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tFIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/"},{"label":"Estructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/"},{"label":"FIRST BREAKTHROUGH ZAR\u00c1TAMO TUNNEL IN EMERGENCY GALLERIES","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/primer-cale-obra-galerias-de-emergencia\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/4461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=4461"}],"version-history":[{"count":4,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/4461\/revisions"}],"predecessor-version":[{"id":7506,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/4461\/revisions\/7506"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/4462"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=4461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=4461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=4461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}