{"id":3551,"date":"2018-04-13T12:56:09","date_gmt":"2018-04-13T12:56:09","guid":{"rendered":"https:\/\/newesteyco.demosbluefish.es\/?p=3551"},"modified":"2022-08-25T07:19:17","modified_gmt":"2022-08-25T07:19:17","slug":"embarque-y-recepcion-de-las-estructuras-del-tim","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/","title":{"rendered":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE"},"content":{"rendered":"<p>The TIM system, consisting of metallic structures and floaters, was shipped from Punta Langosteira (A Coru\u00f1a) last April 7. Funded by CDTI, TIM system is a key piece for the installation of the Offshore prototype Mario Luis Romero Torrent, which is the result of the ELISA and ELICAN projects both funded by the European H2020 programme. Both the offshore tower technology and the TIM platform are solutions patented by Esteyco that aims to reduce the installation costs of marine wind towers.<\/p>\n<p>Its arrival to Las Palmas de Gran Canaria Port was on April 10 where the unloading of nine structures and a container, with a total weight of 400 tons, was performed. Manufacturing of TIM platform was ordered to Horta Coslada, which took advantage of their facilities near Punta Langosteira Port.<\/p>\n<p><a href=\"https:\/\/youtu.be\/H2gaH_SpN74\" rel=\"noopener\" target=\"_blank\">Link Video<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The TIM system, consisting of metallic structures and floaters, was shipped from Punta Langosteira (A Coru\u00f1a) last April 7. Funded by CDTI, TIM system is  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":3555,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5,7,8,12,22,149,271,273,281,292,304],"tags":[],"class_list":["post-3551","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infraestructuras","category-energia","category-mecanica","category-estructuras","category-torres","category-idi","category-eolica-2","category-esteyco-2","category-innovacion-2","category-off-shore-2","category-tecnologia-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Laura March\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-04-13T12:56:09+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-08-25T07:19:17+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#article\",\"name\":\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\\\/ELICAN PROTOTYPE | Esteyco\",\"headline\":\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\\\/ELICAN PROTOTYPE\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/2018-04-11-PHOTO-00000943.jpg\",\"width\":940,\"height\":633},\"datePublished\":\"2018-04-13T12:56:09+02:00\",\"dateModified\":\"2022-08-25T07:19:17+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#webpage\"},\"articleSection\":\"Infraestructuras, Energ\\u00eda, Mec\\u00e1nica Estructural, Estructuras, Torres, I+D+i, E\\u00f3lica, Esteyco, Innovaci\\u00f3n, Off Shore, Tecnolog\\u00eda, Opcional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"position\":2,\"name\":\"Infraestructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"name\":\"Estructuras\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"position\":3,\"name\":\"Estructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#listItem\",\"name\":\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\\\/ELICAN PROTOTYPE\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#listItem\",\"position\":4,\"name\":\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\\\/ELICAN PROTOTYPE\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"name\":\"Estructuras\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/\",\"name\":\"Laura March\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Laura March\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/\",\"name\":\"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\\\/ELICAN PROTOTYPE | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/2018-04-11-PHOTO-00000943.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#mainImage\",\"width\":940,\"height\":633},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/embarque-y-recepcion-de-las-estructuras-del-tim\\\/#mainImage\"},\"datePublished\":\"2018-04-13T12:56:09+02:00\",\"dateModified\":\"2022-08-25T07:19:17+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#article","name":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco","headline":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2018\/04\/2018-04-11-PHOTO-00000943.jpg","width":940,"height":633},"datePublished":"2018-04-13T12:56:09+02:00","dateModified":"2022-08-25T07:19:17+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#webpage"},"articleSection":"Infraestructuras, Energ\u00eda, Mec\u00e1nica Estructural, Estructuras, Torres, I+D+i, E\u00f3lica, Esteyco, Innovaci\u00f3n, Off Shore, Tecnolog\u00eda, Opcional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","position":2,"name":"Infraestructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","name":"Estructuras"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","position":3,"name":"Estructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#listItem","name":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#listItem","position":4,"name":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","name":"Estructuras"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/","name":"Laura March","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g","width":96,"height":96,"caption":"Laura March"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/","name":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2018\/04\/2018-04-11-PHOTO-00000943.jpg","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#mainImage","width":940,"height":633},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/#mainImage"},"datePublished":"2018-04-13T12:56:09+02:00","dateModified":"2022-08-25T07:19:17+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/","article:published_time":"2018-04-13T12:56:09+00:00","article:modified_time":"2022-08-25T07:19:17+00:00","twitter:card":"summary","twitter:title":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE | Esteyco"},"aioseo_meta_data":{"post_id":"3551","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-05-27 11:06:19","updated":"2025-06-05 06:34:44","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/\" title=\"Infraestructuras\">Infraestructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/\" title=\"Estructuras\">Estructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/"},{"label":"Estructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/"},{"label":"TIM STRUCTURES MOVED TO CONNECT TO THE ELISA\/ELICAN PROTOTYPE","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/embarque-y-recepcion-de-las-estructuras-del-tim\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3551","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=3551"}],"version-history":[{"count":6,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3551\/revisions"}],"predecessor-version":[{"id":7375,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3551\/revisions\/7375"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/3555"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=3551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=3551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=3551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}