{"id":3530,"date":"2018-03-28T06:55:43","date_gmt":"2018-03-28T06:55:43","guid":{"rendered":"https:\/\/newesteyco.demosbluefish.es\/?p=3530"},"modified":"2022-08-25T07:19:16","modified_gmt":"2022-08-25T07:19:16","slug":"cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/","title":{"rendered":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM"},"content":{"rendered":"<p>At the beginning of March 2018, CDTI approved the grant for the design and construction of a platform for Transportation (T), Installation (I) and Maintenance (M) of gravity offshore structures with a total budget of 2,4 M\u20ac.<\/p>\n<p>The main technical objective of the project is the development of a new product: a modular metal platform, with the capacity to dock a structure installed in the sea and allow, in a relatively simple way, its transportation, installation and maintenance.<\/p>\n<p>The TIM platform demonstrator project will be used to perform the installation of ELICAN offshore wind turbine full scale prototype, currently under construction with European funds in Las Palmas, validating the technology for its introduction into the market and subsequent commercialization. This system will be used to increase the stability during the transportation and finally the installation of the ELICAN prototype at PLOCAN test area. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the beginning of March 2018, CDTI approved the grant for the design and construction of a platform for Transportation (T), Installation (I) and Maintenance  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":3531,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5,7,12,22,149,271,273,281,292,304],"tags":[],"class_list":["post-3530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infraestructuras","category-energia","category-estructuras","category-torres","category-idi","category-eolica-2","category-esteyco-2","category-innovacion-2","category-off-shore-2","category-tecnologia-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Laura March\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-03-28T06:55:43+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-08-25T07:19:16+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#article\",\"name\":\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco\",\"headline\":\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2018\\\/03\\\/CDTI-TIM.png\",\"width\":940,\"height\":630},\"datePublished\":\"2018-03-28T06:55:43+02:00\",\"dateModified\":\"2022-08-25T07:19:16+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#webpage\"},\"articleSection\":\"Infraestructuras, Energ\\u00eda, Estructuras, Torres, I+D+i, E\\u00f3lica, Esteyco, Innovaci\\u00f3n, Off Shore, Tecnolog\\u00eda, Opcional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"position\":2,\"name\":\"Infraestructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"name\":\"Estructuras\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"position\":3,\"name\":\"Estructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#listItem\",\"name\":\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#listItem\",\"position\":4,\"name\":\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/estructuras\\\/#listItem\",\"name\":\"Estructuras\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/\",\"name\":\"Laura March\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Laura March\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/\",\"name\":\"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2018\\\/03\\\/CDTI-TIM.png\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#mainImage\",\"width\":940,\"height\":630},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\\\/#mainImage\"},\"datePublished\":\"2018-03-28T06:55:43+02:00\",\"dateModified\":\"2022-08-25T07:19:16+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#article","name":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco","headline":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2018\/03\/CDTI-TIM.png","width":940,"height":630},"datePublished":"2018-03-28T06:55:43+02:00","dateModified":"2022-08-25T07:19:16+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#webpage"},"articleSection":"Infraestructuras, Energ\u00eda, Estructuras, Torres, I+D+i, E\u00f3lica, Esteyco, Innovaci\u00f3n, Off Shore, Tecnolog\u00eda, Opcional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","position":2,"name":"Infraestructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","name":"Estructuras"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","position":3,"name":"Estructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#listItem","name":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#listItem","position":4,"name":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/#listItem","name":"Estructuras"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/","name":"Laura March","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g","width":96,"height":96,"caption":"Laura March"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/","name":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2018\/03\/CDTI-TIM.png","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#mainImage","width":940,"height":630},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/#mainImage"},"datePublished":"2018-03-28T06:55:43+02:00","dateModified":"2022-08-25T07:19:16+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/","article:published_time":"2018-03-28T06:55:43+00:00","article:modified_time":"2022-08-25T07:19:16+00:00","twitter:card":"summary","twitter:title":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM | Esteyco"},"aioseo_meta_data":{"post_id":"3530","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-05-27 11:06:19","updated":"2025-06-05 06:33:57","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/\" title=\"Infraestructuras\">Infraestructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/\" title=\"Estructuras\">Estructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tCDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/"},{"label":"Estructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/estructuras\/"},{"label":"CDTI APPROVES THE RESEARCH AND DEVELOPMENT PROJECT FOR THE CONSTRUCTION OF THE TIM PLATFORM","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/cdti-aprueba-el-proyecto-de-investigacion-y-desarrollo-para-la-construccion-de-la-plataforma-tim\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=3530"}],"version-history":[{"count":3,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3530\/revisions"}],"predecessor-version":[{"id":7369,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3530\/revisions\/7369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/3531"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=3530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=3530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=3530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}