{"id":3331,"date":"2017-09-07T11:08:44","date_gmt":"2017-09-07T11:08:44","guid":{"rendered":"https:\/\/newesteyco.demosbluefish.es\/?p=3331"},"modified":"2022-08-25T07:19:10","modified_gmt":"2022-08-25T07:19:10","slug":"finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/","title":{"rendered":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED"},"content":{"rendered":"<p>Holdtrade Atl\u00e1ntico, a British multinational corporation, ANI and FENOCO, with the support of Santa Marta\u2019s Port, performed the first train operational test to transport cargo from Magdalena, the capital, to La Dorada, Caldas.<br \/>\nIt consisted of an operational simulation carried out in Santa Marta maritime terminal. Its objective is to adjust the off-and on-loading process and entry and exit of the train from the port to its final destination. This test is also aimed at improving the concepts of the train inside the Santa Marta\u2019s Port.<br \/>\nThis train, which has 8 wagons, was loaded and unloaded in the maritime terminal to stablish operational times and authentic conditions of the train from its start point to its final destination.<br \/>\nApart from these 8 wagons, a train engine and other equipment, which objective was, among others, to verify the train conditions inside the port\u2019s area, were used. Wagons were loaded with 6 containers and such load as fertilizer bags, wire rods and others.<br \/>\nRenovation works of the railway line are expected to finish in May next year. Then it will be put into operation. The train goes from Santa Marta to La Dorada, which is 767 kms. As part of this project, Esteyco designed the railway access to the Port of Santa Marta and solved the critical points of La Dorada &#8211; Chirgun\u00e1, as well as the feasibility studies for the construction of the railway deviation between the Quebrada del Doctor and Mamatoco.<\/p>\n<p>Source: http:\/\/www.noticiascoopercom.co\/new\/inicio\/siguen-pruebas-del-tren-para-llevar-carga-de-santa-marta-a-la-dorada\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Holdtrade Atl\u00e1ntico, a British multinational corporation, ANI and FENOCO, with the support of Santa Marta\u2019s Port, performed the first train operational test to transport cargo  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":3335,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,11,12,13,274,287],"tags":[],"class_list":["post-3331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-viaria","category-logistica-y-puertos","category-estructuras","category-ingenieria-del-terreno","category-ferroviaria-2","category-medio-ambiente-2"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Laura March\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2017-09-07T11:08:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2022-08-25T07:19:10+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#article\",\"name\":\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\\u2019S HAVE FINISHED | Esteyco\",\"headline\":\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\\u2019S HAVE FINISHED\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/03dis5.jpg\",\"width\":940,\"height\":630},\"datePublished\":\"2017-09-07T11:08:44+02:00\",\"dateModified\":\"2022-08-25T07:19:10+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#webpage\"},\"articleSection\":\"Viaria, Log\\u00edstica y Puertos, Estructuras, Ingenier\\u00eda del Terreno, Ferroviaria, Medio Ambiente, Opcional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"position\":2,\"name\":\"Infraestructuras\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/#listItem\",\"name\":\"Viaria\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/#listItem\",\"position\":3,\"name\":\"Viaria\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#listItem\",\"name\":\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\\u2019S HAVE FINISHED\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/#listItem\",\"name\":\"Infraestructuras\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#listItem\",\"position\":4,\"name\":\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\\u2019S HAVE FINISHED\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/categoria\\\/infraestructuras\\\/viaria\\\/#listItem\",\"name\":\"Viaria\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/\",\"name\":\"Laura March\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Laura March\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/\",\"name\":\"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\\u2019S HAVE FINISHED | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/03dis5.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#mainImage\",\"width\":940,\"height\":630},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructuras\\\/viaria\\\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\\\/#mainImage\"},\"datePublished\":\"2017-09-07T11:08:44+02:00\",\"dateModified\":\"2022-08-25T07:19:10+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#article","name":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco","headline":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2017\/09\/03dis5.jpg","width":940,"height":630},"datePublished":"2017-09-07T11:08:44+02:00","dateModified":"2022-08-25T07:19:10+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#webpage"},"articleSection":"Viaria, Log\u00edstica y Puertos, Estructuras, Ingenier\u00eda del Terreno, Ferroviaria, Medio Ambiente, Opcional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","position":2,"name":"Infraestructuras","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/#listItem","name":"Viaria"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/#listItem","position":3,"name":"Viaria","item":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#listItem","name":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/#listItem","name":"Infraestructuras"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#listItem","position":4,"name":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/#listItem","name":"Viaria"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/","name":"Laura March","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g","width":96,"height":96,"caption":"Laura March"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/","name":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2017\/09\/03dis5.jpg","@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#mainImage","width":940,"height":630},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/#mainImage"},"datePublished":"2017-09-07T11:08:44+02:00","dateModified":"2022-08-25T07:19:10+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/","article:published_time":"2017-09-07T11:08:44+00:00","article:modified_time":"2022-08-25T07:19:10+00:00","twitter:card":"summary","twitter:title":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED | Esteyco"},"aioseo_meta_data":{"post_id":"3331","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-05-27 11:07:20","updated":"2025-06-05 06:30:02","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/\" title=\"Infraestructuras\">Infraestructuras<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/\" title=\"Viaria\">Viaria<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tOPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructuras","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/"},{"label":"Viaria","link":"https:\/\/www.esteyco.com\/categoria\/infraestructuras\/viaria\/"},{"label":"OPERATIONAL TESTS FOR THE SANTA MARTA-LA DORADA FREIGHT TRAIN IN PORT\u2019S HAVE FINISHED","link":"https:\/\/www.esteyco.com\/en\/infraestructuras\/viaria\/finalizan-las-pruebas-para-funcionamiento-del-tren-de-carga-santa-marta-la-dorada-en-entorno-portuario\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=3331"}],"version-history":[{"count":5,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3331\/revisions"}],"predecessor-version":[{"id":7339,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/3331\/revisions\/7339"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/3335"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=3331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=3331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=3331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}