{"id":17531,"date":"2026-08-07T12:40:37","date_gmt":"2026-08-07T10:40:37","guid":{"rendered":"https:\/\/www.esteyco.com\/?p=17531"},"modified":"2026-08-07T13:08:15","modified_gmt":"2026-08-07T11:08:15","slug":"wheel-secures-prior-administrative-authorization-for-plocan-deployment","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/","title":{"rendered":"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment"},"content":{"rendered":"<p>As prototype construction progresses at the Port of Las Palmas, ESTEYCO has secured Prior Administrative Authorization for the installation of <a href=\"https:\/\/www.esteyco.com\/energia\/wheel-presentacion-las-palmas\/\">WHEEL<\/a> and its power evacuation infrastructure. This regulatory milestone paves the way for the prototype\u2019s deployment and subsequent grid connection.<\/p>\n<p>The Directorate-General for Energy Policy and Mines granted ESTEYCO the authorization to install the 6 MW WHEEL floating offshore wind prototype at the Oceanic Platform of the Canary Islands (<a href=\"https:\/\/plocan.eu\/en\">PLOCAN<\/a>) test site, off the coast of Las Palmas de Gran Canaria.<\/p>\n<p>The permit also covers the power evacuation infrastructure, which features a 3-kilometer, 20 kV subsea cable. This cable will connect WHEEL to ESTEYCO\u2019s <a href=\"https:\/\/plocan.eu\/puesta-en-marcha-del-proyecto-elican-de-aerogenerador-marino-liderado-por-esteyco\">ELICAN<\/a> prototype, routing the generated electricity to the Jin\u00e1mar substation via existing electrical infrastructure.<\/p>\n<p>This approval represents a major step forward in the project\u2019s permitting process, following a favorable environmental impact assessment and authorization from the Spanish Aviation Safety and Security Agency (AESA) for installation at PLOCAN.<\/p>\n<h2><strong>Designed to Leverage Existing Port Infrastructure<\/strong><\/h2>\n<p>WHEEL technology aims to prove that floating offshore wind platforms can be built efficiently within standard port areas without requiring costly infrastructure upgrades.<\/p>\n<p>Its compact design streamlines manufacturing, assembly, and float-out operations within the port. Once deployed, the platform functions as a spar\u2014combining the supply-chain advantages of a compact build with the operational stability of traditional spar designs.<\/p>\n<p>In doing so, WHEEL integrates an optimized design for industrialization and installation with high-level operational performance in a single system.<\/p>\n<p>The insights gained during the construction phase in Las Palmas de Gran Canaria are key to validating the supply chain, manufacturing processes, and the technology\u2019s capacity for commercial-scale production.<\/p>\n<p>Through this pilot project, ESTEYCO positions WHEEL at the forefront of floating offshore wind innovation, advancing its path toward becoming a competitive, scalable solution for the commercial market.<\/p>\n<div class=\"video-shortcode\"><iframe title=\"WHEEL: Enabling Cost-Efficient Floating Wind at Scale\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/SFVKdXBSFqg?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/div>\n<p><img decoding=\"async\" class=\"lazyload aligncenter wp-image-17461\" src=\"https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1.png\" data-orig-src=\"https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1.png\" alt=\"\" width=\"385\" height=\"230\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27385%27%20height%3D%27230%27%20viewBox%3D%270%200%20385%20230%27%3E%3Crect%20width%3D%27385%27%20height%3D%27230%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1-200x119.png 200w, https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1-300x179.png 300w, https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1-400x239.png 400w, https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1-600x358.png 600w, https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1-768x459.png 768w, https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1-800x478.png 800w, https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/05\/HORIZON-EUROPE-FUNDED-1.png 871w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 385px) 100vw, 385px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As prototype construction progresses at the Port of Las Palmas, ESTEYCO has secured Prior Administrative Authorization for the installation of WHEEL and its power evacuation  [&#8230;]<\/p>\n","protected":false},"author":21,"featured_media":17534,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[23,157,214,394,396,426],"tags":[],"class_list":["post-17531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-off-shore","category-elican","category-plocan","category-energy","category-offshore-en-2","category-wheel-en"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Josep Gimeno\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"WHEEL obtains prior authorisation for installation at PLOCAN\" \/>\n\t\t<meta property=\"og:description\" content=\"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-07T10:40:37+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-07T11:08:15+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"WHEEL obtains prior authorisation for installation at PLOCAN\" \/>\n\t\t<meta name=\"twitter:description\" content=\"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#article\",\"name\":\"WHEEL obtains prior authorisation for installation at PLOCAN\",\"headline\":\"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/jgimeno\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/imagen.jpg\",\"width\":2400,\"height\":1350},\"datePublished\":\"2026-08-07T12:40:37+02:00\",\"dateModified\":\"2026-08-07T13:08:15+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#webpage\"},\"articleSection\":\"Off Shore, Elican, Plocan, Energy, Offshore, Wheel, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/#listItem\",\"name\":\"Energy\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/#listItem\",\"position\":2,\"name\":\"Energy\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/off-shore\\\/#listItem\",\"name\":\"Off Shore\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/off-shore\\\/#listItem\",\"position\":3,\"name\":\"Off Shore\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/off-shore\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#listItem\",\"name\":\"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/#listItem\",\"name\":\"Energy\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#listItem\",\"position\":4,\"name\":\"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/energy\\\/off-shore\\\/#listItem\",\"name\":\"Off Shore\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/jgimeno\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/jgimeno\\\/\",\"name\":\"Josep Gimeno\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/790b082617e4eb427c2c25bdb9e57615f44dcc9e9be5a3ff47038398bb7ee79b?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Josep Gimeno\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/\",\"name\":\"WHEEL obtains prior authorisation for installation at PLOCAN\",\"description\":\"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/jgimeno\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/jgimeno\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/imagen.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#mainImage\",\"width\":2400,\"height\":1350},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/energy\\\/off-shore\\\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\\\/#mainImage\"},\"datePublished\":\"2026-08-07T12:40:37+02:00\",\"dateModified\":\"2026-08-07T13:08:15+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"WHEEL obtains prior authorisation for installation at PLOCAN","description":"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.","canonical_url":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#article","name":"WHEEL obtains prior authorisation for installation at PLOCAN","headline":"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/jgimeno\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/08\/imagen.jpg","width":2400,"height":1350},"datePublished":"2026-08-07T12:40:37+02:00","dateModified":"2026-08-07T13:08:15+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#webpage"},"articleSection":"Off Shore, Elican, Plocan, Energy, Offshore, Wheel, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/energy\/#listItem","name":"Energy"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/energy\/#listItem","position":2,"name":"Energy","item":"https:\/\/www.esteyco.com\/en\/category\/energy\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/energy\/off-shore\/#listItem","name":"Off Shore"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/energy\/off-shore\/#listItem","position":3,"name":"Off Shore","item":"https:\/\/www.esteyco.com\/en\/category\/energy\/off-shore\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#listItem","name":"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/energy\/#listItem","name":"Energy"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#listItem","position":4,"name":"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/energy\/off-shore\/#listItem","name":"Off Shore"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/jgimeno\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/jgimeno\/","name":"Josep Gimeno","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/790b082617e4eb427c2c25bdb9e57615f44dcc9e9be5a3ff47038398bb7ee79b?s=96&d=mm&r=g","width":96,"height":96,"caption":"Josep Gimeno"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#webpage","url":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/","name":"WHEEL obtains prior authorisation for installation at PLOCAN","description":"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/jgimeno\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/jgimeno\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2026\/08\/imagen.jpg","@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#mainImage","width":2400,"height":1350},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/#mainImage"},"datePublished":"2026-08-07T12:40:37+02:00","dateModified":"2026-08-07T13:08:15+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"WHEEL obtains prior authorisation for installation at PLOCAN","og:description":"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.","og:url":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/","article:published_time":"2026-08-07T10:40:37+00:00","article:modified_time":"2026-08-07T11:08:15+00:00","twitter:card":"summary","twitter:title":"WHEEL obtains prior authorisation for installation at PLOCAN","twitter:description":"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands."},"aioseo_meta_data":{"post_id":"17531","title":"WHEEL obtains prior authorisation for installation at PLOCAN","description":"ESTEYCO obtains prior administrative authorisation to install the 6 MW WHEEL floating offshore wind prototype at PLOCAN in the Canary Islands.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-08-07 10:34:51","updated":"2026-08-07 11:08:36","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/category\/energy\/\" title=\"Energy\">Energy<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/category\/energy\/off-shore\/\" title=\"Off Shore\">Off Shore<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tWHEEL Secures Prior Administrative Authorization for PLOCAN Deployment\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Energy","link":"https:\/\/www.esteyco.com\/en\/category\/energy\/"},{"label":"Off Shore","link":"https:\/\/www.esteyco.com\/en\/category\/energy\/off-shore\/"},{"label":"WHEEL Secures Prior Administrative Authorization for PLOCAN Deployment","link":"https:\/\/www.esteyco.com\/en\/energy\/off-shore\/wheel-secures-prior-administrative-authorization-for-plocan-deployment\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/17531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=17531"}],"version-history":[{"count":3,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/17531\/revisions"}],"predecessor-version":[{"id":17536,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/17531\/revisions\/17536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/17534"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=17531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=17531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=17531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}