{"id":15600,"date":"2023-10-25T10:15:55","date_gmt":"2023-10-25T08:15:55","guid":{"rendered":"https:\/\/www.esteyco.com\/uncategorized\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/"},"modified":"2023-10-25T10:15:55","modified_gmt":"2023-10-25T08:15:55","slug":"commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/","title":{"rendered":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM"},"content":{"rendered":"<p>The energy company RWE implements an R+D+i project in the new Orkoien wind farm, near Pamplona. The wind farm, in which a 5.7 MW prototype has been installed, has combined innovative technologies that reduce the environmental impact during the construction phase \u2013 the use of plastic mats that minimise the impact of construction on the ground in temporary work areas \u2013 and greenhouse gas emissions during operation. by mainly using dry air as an insulating agent to interrupt the electrical currents in the medium voltage switchgear.<\/p>\n<p>In this sense, Esteyco has participated as one of the main actors during the development of the works, exercising the work of Project Management for the execution of BoP, foundations and electrical works; as well as the installation of the 105-meter metal tower and the 5.7 MW NORDEX wind turbine.<\/p>\n<p>In addition, we have collaborated with RWE in the monitoring of the foundation executed with a layer of EPS in the central part under the slab. In addition, we have collaborated with RWE in the monitoring of the foundation executed with a layer of EPS in the central part under the slab. As this is an innovative solution, on-site instrumentation has been installed to study and evaluate the performance and effectiveness of the design during the construction and operation phase.<\/p>\n<p><a href=\"https:\/\/www.rwe.com\/-\/media\/RWE\/RWE-Spain\/press\/downloads\/2023-10-09-prueba-superada-rwe-incorpora-nuevas-tecnologas.pdf\">Test passed &#8211; RWE incorporates new technologies to achieve more sustainable wind energy<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The energy company RWE implements an R+D+i project in the new Orkoien wind farm, near Pamplona. The wind farm, in which a 5.7 MW prototype  [&#8230;]<\/p>\n","protected":false},"author":14,"featured_media":15598,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[14,21,154,394,403,404,427],"tags":[],"class_list":["post-15600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infraestructures-environment","category-wind","category-esteyco","category-energy","category-rd","category-infraestructures","category-environment-en"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Bluefish\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-10-25T08:15:55+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-10-25T08:15:55+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#article\",\"name\":\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco\",\"headline\":\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/bluefish\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/231020_Orkoien-scaled.jpg\",\"width\":1928,\"height\":2560},\"datePublished\":\"2023-10-25T10:15:55+02:00\",\"dateModified\":\"2023-10-25T10:15:55+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#webpage\"},\"articleSection\":\"Environment, Wind, Esteyco, Energy, R&amp;D, Infraestructures, Environment, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/#listItem\",\"name\":\"Infraestructures\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/#listItem\",\"position\":2,\"name\":\"Infraestructures\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/infraestructures-environment\\\/#listItem\",\"name\":\"Environment\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/infraestructures-environment\\\/#listItem\",\"position\":3,\"name\":\"Environment\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/infraestructures-environment\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#listItem\",\"name\":\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/#listItem\",\"name\":\"Infraestructures\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#listItem\",\"position\":4,\"name\":\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/infraestructures-environment\\\/#listItem\",\"name\":\"Environment\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/bluefish\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/bluefish\\\/\",\"name\":\"Bluefish\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0de97c4149a0edfe23cab1e30d98c6e0f5a2548d379f8d6110a3ddec8e300ed7?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Bluefish\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/\",\"name\":\"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/bluefish\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/bluefish\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/231020_Orkoien-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#mainImage\",\"width\":1928,\"height\":2560},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/infraestructures-environment\\\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\\\/#mainImage\"},\"datePublished\":\"2023-10-25T10:15:55+02:00\",\"dateModified\":\"2023-10-25T10:15:55+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#article","name":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco","headline":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/bluefish\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2023\/10\/231020_Orkoien-scaled.jpg","width":1928,"height":2560},"datePublished":"2023-10-25T10:15:55+02:00","dateModified":"2023-10-25T10:15:55+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#webpage"},"articleSection":"Environment, Wind, Esteyco, Energy, R&amp;D, Infraestructures, Environment, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/#listItem","name":"Infraestructures"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/#listItem","position":2,"name":"Infraestructures","item":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/infraestructures-environment\/#listItem","name":"Environment"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/infraestructures-environment\/#listItem","position":3,"name":"Environment","item":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/infraestructures-environment\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#listItem","name":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/#listItem","name":"Infraestructures"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#listItem","position":4,"name":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/infraestructures-environment\/#listItem","name":"Environment"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/bluefish\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/bluefish\/","name":"Bluefish","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/0de97c4149a0edfe23cab1e30d98c6e0f5a2548d379f8d6110a3ddec8e300ed7?s=96&d=mm&r=g","width":96,"height":96,"caption":"Bluefish"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/","name":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/bluefish\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/bluefish\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2023\/10\/231020_Orkoien-scaled.jpg","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#mainImage","width":1928,"height":2560},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/#mainImage"},"datePublished":"2023-10-25T10:15:55+02:00","dateModified":"2023-10-25T10:15:55+02:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/","article:published_time":"2023-10-25T08:15:55+00:00","article:modified_time":"2023-10-25T08:15:55+00:00","twitter:card":"summary","twitter:title":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM | Esteyco"},"aioseo_meta_data":{"post_id":"15600","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-10-25 08:18:24","updated":"2025-06-05 07:16:10","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/\" title=\"Infraestructures\">Infraestructures<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/infraestructures-environment\/\" title=\"Environment\">Environment<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tCOMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructures","link":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/"},{"label":"Environment","link":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/infraestructures-environment\/"},{"label":"COMMISSIONING OF THE 5.7 MW PROTOTYPE BEGINS AT THE ORKOIEN WIND FARM","link":"https:\/\/www.esteyco.com\/en\/infraestructures\/infraestructures-environment\/commissioning-of-the-5-7-mw-prototype-begins-at-the-orkoien-wind-farm\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/15600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=15600"}],"version-history":[{"count":0,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/15600\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/15598"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=15600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=15600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=15600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}