{"id":14842,"date":"2023-03-09T14:28:22","date_gmt":"2023-03-09T14:28:22","guid":{"rendered":"https:\/\/www.esteyco.com\/uncategorized\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/"},"modified":"2023-03-14T07:34:42","modified_gmt":"2023-03-14T07:34:42","slug":"the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024","status":"publish","type":"post","link":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/","title":{"rendered":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024"},"content":{"rendered":"<p>During yesterday&#8217;s visit to the Gaintxurizketa tunnel, the general manager of Adif AV, Juan Pablo Villanueva, the Minister of Transport I\u00f1aki Arriola and the delegate of the Government of the Basque Country, Denis Itxaso, announced that by the end of 2024 the third rail will be a reality throughout the section of the connection between Astigarraga and Irun of the future Basque Y. <\/p>\n<p>Esteyco is carrying out the assistance to the construction control (ACO) in the works for the implementation of the standard gauge in the Astigarraga-Ir\u00fan section, by means of the implementation of the third rail. This solution takes advantage of the infrastructure and the layout of the line currently in service, allowing in the future the passage of high speed and conventional network traffic.<\/p>\n<p>Due to this mixed solution, it is necessary to adapt the gauges of the different structures present along the entire route, including the enlargement of the Gaintxurizketa tunnel section, by means of the TES (Tunnel Enlargement System), which allows railway traffic to be maintained during the execution works.<\/p>\n<p>Related press news:<\/p>\n<p><a href=\"https:\/\/www.diariovasco.com\/gipuzkoa\/van-obras-tav-gaintxurizketa-20230309145317-ga.html\" title=\"https:\/\/www.diariovasco.com\/gipuzkoa\/van-obras-tav-gaintxurizketa-20230309145317-ga.html\">https:\/\/www.diariovasco.com\/gipuzkoa\/van-obras-tav-gaintxurizketa-20230309145317-ga.html<\/a><\/p>\n<p><a href=\"https:\/\/www.diariovasco.com\/gipuzkoa\/obra-tav-astigarraga-irun-terminara-finales-2024-20230309141553-nt.html\" title=\"https:\/\/www.diariovasco.com\/gipuzkoa\/obra-tav-astigarraga-irun-terminara-finales-2024-20230309141553-nt.html\">https:\/\/www.diariovasco.com\/gipuzkoa\/obra-tav-astigarraga-irun-terminara-finales-2024-20230309141553-nt.html<\/a><\/p>\n<p><a href=\"https:\/\/www.donostitik.com\/el-tercer-hilo-en-el-tramo-astigarraga-irun-estara-terminado-a-final-de-2024\/\" title=\"https:\/\/www.donostitik.com\/el-tercer-hilo-en-el-tramo-astigarraga-irun-estara-terminado-a-final-de-2024\/\">https:\/\/www.donostitik.com\/el-tercer-hilo-en-el-tramo-astigarraga-irun-estara-terminado-a-final-de-2024\/<\/a><\/p>\n<p><a href=\"https:\/\/www.donostitik.com\/el-tercer-hilo-en-el-tramo-astigarraga-irun-estara-terminado-a-final-de-2024\/\" title=\"https:\/\/www.donostitik.com\/el-tercer-hilo-en-el-tramo-astigarraga-irun-estara-terminado-a-final-de-2024\/\">https:\/\/www.donostitik.com\/el-tercer-hilo-en-el-tramo-astigarraga-irun-estara-terminado-a-final-de-2024\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>During yesterday&#8217;s visit to the Gaintxurizketa tunnel, the general manager of Adif AV, Juan Pablo Villanueva, the Minister of Transport I\u00f1aki Arriola and the delegate  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":14827,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,14,404,405,406],"tags":[],"class_list":["post-14842","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-railway","category-infraestructures-environment","category-infraestructures","category-structures","category-field-engineering"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Laura March\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-03-09T14:28:22+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-03-14T07:34:42+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#article\",\"name\":\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \\u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco\",\"headline\":\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024\",\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/230310_Astigarraga-scaled.jpg\",\"width\":2560,\"height\":1920},\"datePublished\":\"2023-03-09T14:28:22+01:00\",\"dateModified\":\"2023-03-14T07:34:42+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#webpage\"},\"articleSection\":\"Railway, Environment, Infraestructures, Structures, Field engineering, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/#listItem\",\"name\":\"Infraestructures\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/#listItem\",\"position\":2,\"name\":\"Infraestructures\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/railway\\\/#listItem\",\"name\":\"Railway\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/railway\\\/#listItem\",\"position\":3,\"name\":\"Railway\",\"item\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/railway\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#listItem\",\"name\":\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/#listItem\",\"name\":\"Infraestructures\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#listItem\",\"position\":4,\"name\":\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/category\\\/infraestructures\\\/railway\\\/#listItem\",\"name\":\"Railway\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/\",\"name\":\"Laura March\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Laura March\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#webpage\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/\",\"name\":\"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \\u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/author\\\/lauramarch\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/230310_Astigarraga-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#mainImage\",\"width\":2560,\"height\":1920},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/infraestructures\\\/railway\\\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\\\/#mainImage\"},\"datePublished\":\"2023-03-09T14:28:22+01:00\",\"dateModified\":\"2023-03-14T07:34:42+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/\",\"name\":\"Esteyco\",\"description\":\"Esteyco es una consultor\\u00eda independiente de arquitectura civil e ingenier\\u00eda con m\\u00e1s de 40 a\\u00f1os de servicio en todo el mundo.\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esteyco.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco","description":"","canonical_url":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#article","name":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco","headline":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024","author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2023\/03\/230310_Astigarraga-scaled.jpg","width":2560,"height":1920},"datePublished":"2023-03-09T14:28:22+01:00","dateModified":"2023-03-14T07:34:42+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#webpage"},"isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#webpage"},"articleSection":"Railway, Environment, Infraestructures, Structures, Field engineering, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","position":1,"name":"Inicio","item":"https:\/\/www.esteyco.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/#listItem","name":"Infraestructures"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/#listItem","position":2,"name":"Infraestructures","item":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/railway\/#listItem","name":"Railway"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/railway\/#listItem","position":3,"name":"Railway","item":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/railway\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#listItem","name":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/#listItem","name":"Infraestructures"}},{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#listItem","position":4,"name":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024","previousItem":{"@type":"ListItem","@id":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/railway\/#listItem","name":"Railway"}}]},{"@type":"Organization","@id":"https:\/\/www.esteyco.com\/en\/#organization","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","url":"https:\/\/www.esteyco.com\/en\/"},{"@type":"Person","@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author","url":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/","name":"Laura March","image":{"@type":"ImageObject","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/64deaeefe497a20864037c3ea0fdb4bca8be9b2f550584440bbda5acc06d7b4f?s=96&d=mm&r=g","width":96,"height":96,"caption":"Laura March"}},{"@type":"WebPage","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#webpage","url":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/","name":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.esteyco.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#breadcrumblist"},"author":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"creator":{"@id":"https:\/\/www.esteyco.com\/en\/author\/lauramarch\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.esteyco.com\/wp-content\/uploads\/2023\/03\/230310_Astigarraga-scaled.jpg","@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#mainImage","width":2560,"height":1920},"primaryImageOfPage":{"@id":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/#mainImage"},"datePublished":"2023-03-09T14:28:22+01:00","dateModified":"2023-03-14T07:34:42+01:00"},{"@type":"WebSite","@id":"https:\/\/www.esteyco.com\/en\/#website","url":"https:\/\/www.esteyco.com\/en\/","name":"Esteyco","description":"Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.esteyco.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Esteyco | Esteyco es una consultor\u00eda independiente de arquitectura civil e ingenier\u00eda con m\u00e1s de 40 a\u00f1os de servicio en todo el mundo.","og:type":"article","og:title":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco","og:url":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/","article:published_time":"2023-03-09T14:28:22+00:00","article:modified_time":"2023-03-14T07:34:42+00:00","twitter:card":"summary","twitter:title":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024 | Esteyco"},"aioseo_meta_data":{"post_id":"14842","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-03-14 07:34:41","updated":"2025-06-05 07:11:55","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/\" title=\"Infraestructures\">Infraestructures<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/railway\/\" title=\"Railway\">Railway<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTHE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA \u2013 IRUN CONNECTION WILL BE COMPLETED IN 2024\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/www.esteyco.com\/en\/"},{"label":"Infraestructures","link":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/"},{"label":"Railway","link":"https:\/\/www.esteyco.com\/en\/category\/infraestructures\/railway\/"},{"label":"THE LAYING OF THE THIRD WIRE ON THE ASTIGARRAGA &#8211; IRUN CONNECTION WILL BE COMPLETED IN 2024","link":"https:\/\/www.esteyco.com\/en\/infraestructures\/railway\/the-laying-of-the-third-wire-on-the-astigarraga-irun-connection-will-be-completed-in-2024\/"}],"_links":{"self":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/14842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/comments?post=14842"}],"version-history":[{"count":1,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/14842\/revisions"}],"predecessor-version":[{"id":14843,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/posts\/14842\/revisions\/14843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media\/14827"}],"wp:attachment":[{"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/media?parent=14842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/categories?post=14842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esteyco.com\/en\/wp-json\/wp\/v2\/tags?post=14842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}