R&D


2019-2022

INNOVATIVE SME

Valid until February 21, 2022

(0€)

2019-2022

HORIZON 2020

The COREWIND project aims to achieve significant cost reductions and enhance performance of floating wind technology through the research and optimization of mooring and anchoring systems and dynamic cables. The results will be validated by taking as reference two concrete-based floater concepts supporting DTU 15 MW wind turbine.

(170K€)

2019-2022

HORIZON 2020

FLOTANT. New anchoring and mooring systems to reduce costs on a hybrid concrete-plastic floating platform

(377K€)

2014-2019

MICINN

EMPLEA Grants

Esteyco has been aided with both EMP-TU-2015-4373 and EMP-TU-2015-4374 grants by the State Programme for the Promotion of Talent and its Employability, within the State Plan for Scientific, Technical and Innovation Research 2013-2016 of the Ministry of Science, Innovation and Universities (MICINN), formerly MINECO

(655k€)

2018-2019

HAZITEK (SPRI)

B-LUZATU. Study on Revamping and Life Extension of the structural integrity of a wind turbine and wind tower foundations.

(186K€)

2018-2019

CDTI-INNOGLOBAL

TA-EST. Development of the primary structure supporting the main mirrors of the largest solar telescope in Europe

(250K€)

2017-2019

CDTI-PID

TIM. Platform for Transport (T), Installation (I) and Maintenance(M) for offshore structures

(2.4M€)

2017-2020

INTERREG

ARCWIND. Adaptation and Implementation of TELWIND floating wind energy conversion technology for the Atlantic Region

(350K€)

2017-2018

EUROSTARS

ELITYRE. Self installing and anti-scour system based on Tyre Networks (TFNS) for offshore wind towers

(280K€)

2016-2018

HORIZON 2020

ELICAN.Off-Shore telescopic tower prototype  Funding from UE
(Arinaga)

(6,6M€)

2017-2020

CDTI

Accelerators and technologies related to large scientific facilities

(503k€)

2015-2018

HORIZON 2020

TELWIND. Marine Floating solution development
Funding from UE

(1,8M€)

2015-2018

CDTI

Technologies research related
to Off-shore floating wind farms

(641k€)

2015-2017

HORIZON 2020

ELISA. Off-shore foundation prototype
Funding from UE

(3,5M€)

2015-2017

(Español) MINECO

RETOS Program
Offshore Wind Power Costs Reduction Program

(302k€)

2015-2016

CDTI

Research related to large
scientific facilities

(192k€)

2014-2015

EEA GRANTS

EEA GRANTS
Theoretical-experimental testing + Design Optimization

(379k€)

2012-2014

ACCIÓ

Structural Lab testing +
Advced numerical modelling

(63k€)

2014-2015

(Español) EEA GRANTS 2014

EEA GRANTS 2014
Experimental Development of a braced concrete foundation.

(385k€)

2013-2014

EUROSTARS

Telescopic Tower
full scale prototype

(925k€)

2012-2014

CDTI

Scale Tests
+ Design optimization

(294k€)

2009-2010

CDTI

Research and
Technical development

(669k€)

2009-2010

MINECO

First investigations
and first patents

(306k€)

Esteyco