Category: Túneles
SECOND STALL IN THE NEW EMERGENCY GALLERIES IN THE TUNNELS OF VITORIA-BILBAO-SAN SEBASTIÁN HIGH-SPEED LINE
Last Wednesday, November 25th, the second stall was successfully completed in the emergency gallery of the Zarátamo tunnel. In this way, the excavation of the...
FIRST BREAKTHROUGH ZARÁTAMO TUNNEL IN EMERGENCY GALLERIES
Last Monday, September 28th, the first breakthrough was successfully completed in the emergency gallery of the Zarátamo tunnel. This gallery has a length of 728.30...
NEW EMERGENCY GALLERIES IN THE TUNNELS OF THE HIGH SPEED LINE VITORIA-BILBAO-SAN SEBASTIAN
The Esteyo-Team UTE carries out the work of the ACO (Assistance for Construction Control) for ADIF in the works: "New emergency galleries in the tunnels...